
RubyBuild Have Best
Our Past Jobs
| S/NO | PROJECT | DATE | CLIENT |
CONTRACT NO.
|
| 1 | Design and construction of Engineered Bio cell bund wall at Ejama Ebubu, Eleme Rivers State | 2011 | SPDC | NG01009644 |
| 2 | Design and construction of structural steel workshop at Ejama Ebubu, Eleme Rivers State | 2010 | SPDC | NG01008971 |
| 3 | Studies and design of integrated water scheme for Ekpetiama communities, Bayelsa State | 2010 | SPDC | NG01005817 |
| 4 | Detailed Design of New Laundry building at bonny terminal | 2010 | SPDC | |
| 5 | Design of Obunagha integrated water project, Bayelsa State | 2010 | SPDC | |
| 6 | Studies and design of shore protection and drainage for Bonny Terminal | 2009 | SPDC | NG01003609 |
| 7 | Geotechnical Investigation for Sand Search along Tebidaba River for Reclamation works at Tebidaba Flow station. | 2006 | NAOC |
4500006284000 |